Migrate all repos into monorepo context folders

Bahn: aisupport, Analyse-O2C-C2S, awesome-bahn-mcp-servers, beam-mcp,
      Confluence_Bot, db-planet-mcp-server, O2C-Harness, project-audit,
      Projekt-KIQ-HP, teamlandkarte-mcp
Dhive: Jury-Voting
Privat: CV, NoteGraph (NOTE: NoteGraph needs complete redo after consolidation)
Shared: AI-Orchestrator, OrgMyLife, power_skills_and_more
Shared/references: symphony (read-only)

Bahn repos remain available as independent remotes - this monorepo
pulls them in via subtree, the originals are untouched.
This commit is contained in:
2026-06-30 20:39:52 +02:00
parent 2f2b295531
commit a5f8fb49ab
1717 changed files with 447332 additions and 0 deletions
@@ -0,0 +1,35 @@
# ART BARD
Version: 33 | Last modified: 2026-04-13T11:17:28.696+02:00
Source: confluence page ID 222757150
---
| Herzlich Willkommen auf der Startseite unseres ART "BARD" (BARD = Baustellen, Anmeldung, Realisierung, Durchführung)
Wir gehören zum Value Team Capacity to Schedule (kurz C2S: )
Hier finden Sie einige wichtige Informationen und Links zu unserem ART. 
|
ART BARD Vision
ART BARD Teams
ART BARD TrioProduktmanager (PM) | Systemarchitekten (SA) | Release Train Engineers (RTE) |
|
|
|
ART BARD Business OwnerKontakt
| OE |
aktuell in Elternzeit
| DB InfraGO AG
Kennzahlen und Analysen Kapazitätssteuerung (I.IBF 52)
|
ab 01.01.2026
| DB InfraGO AG
Strategischer Fahrplan und Netzkonzeption (I.IBF 21)
|
| DB InfraGO AG
Unterjähriger Fahrplan und Baubetriebsmanagement (I.IBF 4)
|
ART BARD Wiki-StrukturDie Struktur dieses Wikis orientiert sich an den drei Dimensionen des SAFe Frameworks fachlich, technisch und methodisch. Genauer beschrieben ist diese Struktur .
@@ -0,0 +1,153 @@
# Ablauf PIP38 Team AST
Version: 3 | Last modified: 2025-09-16T13:51:15.241+02:00
Source: confluence page ID 487745046
---
{"generalSettings":{"tabSpacing":3,"tabWidth":100,"tabHeight":65,"direction":"horizontal"},"activeSettings":{"backgroundColor":{"color":"#040081"},"text":{"fontSize":36,"color":"#fff","textAlign":"left","fontWeight":"normal"}},"inactiveSettings":{"backgroundColor":{"color":"#f4f5f7"},"text":{"fontSize":18,"color":"#5e6c84","textAlign":"left","fontWeight":"lighter"}},"contentSettings":{"backgroundColor":{"color":"#fff"},"boxShadow":{"shadows":[{"color":"rgba(0, 0, 0, 0.2)","x":0,"y":1,"blur":6,"spread":0},{"color":"rgba(0, 0, 0, 0.4)","x":0,"y":12,"blur":4,"spread":-10}]},"border":{"style":"solid","width":1,"top":false,"bottom":true,"left":true,"right":true,"color":"#f4f5f7"},"padding":{"top":15,"right":15,"bottom":15,"left":15}},"hoverSettings":{"backgroundColor":{"color":"#dfe1e6"},"text":{"fontSize":18,"color":"#5e6c84","textAlign":"left","fontWeight":"lighter"}}}1
PI Planning Tag 1
| Zeit | Thema | Inhalt | Wer |
1 | 09:00 - 09:30
| Business Context C2S
Bereich A.5.500
| ART schaut gemeinsam Business Context
| ART |
2 | 09:30 - 10:30
| BARD Business Context und Architekturvision
Bereich A.5.500
| Socializing / Kaffee trinken etc.
Trio: Agenda 
Planungsprämissen PI 38 & Inhaltlicher Scope
Blick auf die Features
Timeboxed Fragen 
Release-Planung: Zeitplan Validierung
| ART
|
3 | 10:30 - 13:00 | Team Breakout Sessions (I von IV)
Bereich A.5.400
| Features je Team in priorisierter Reihenfolge vorstellen 
Fachliche Deadlines (Spez/Meilenstein) anschauen
Aufteilung der Themen 
Breakdown der User Stories Stories erstellen und beschreiben
Personen zuordnen
Erste Schätzung abgeben 
________________________________________________________________
Termine in Breakout I
12:00-13:00 Termin mit FOps: 
Besprechen, welche Cases wir in PI38 haben und welche Konfig bei FOps landet
| AST  |
4 | 13:00 - 14:00 | Mittagspause
Raum B0.KF2
| Gemeinsames Pizza essen | ART |
6 | 14:00 - 16:30  | Team Breakout (II von IV)
Bereich A.5.400
| Feature Breakdown: User Storys erstellen inkl. Schätzung und in Jira verlinken
Risiken erstellen und Verlinkung in Jira sicherstellen
Abhängigkeiten zu anderen Teams erstellen und verlinken
wenn möglich groben Entwurf Objectives erstellen
Ziel: zum Draft Plan Review
Beantworten bis Mi, 16:30:
Welche fachlichen Deadlines gibt es in diesem PI? Welche Risiken sehen wir?
Ist die Releaseplanung für uns so durchführbar? Welche Risiken sehen wir?
Welche Features schaffen wir nicht in diesem PI?
Wo sehen wir Abhängigkeiten? (Wenn wir das machen wollen, muss vorher ... passiert sein.)
Welche Risiken sehen wir sonst?
____________________________________________________________________
Termine in Breakout II
15:00-15:15: Sync Trio + POs und SM (Raum A.5.716)
Fachliche Abhängigkeiten
Impediments & Risiken
Vereinbarung von Gesprächs-Slots
Evaluierung Planning Fortschritt des Teams
15:30-16:30: PZE + Carla 
| AST |
7 | 16.30 - 17.30
| Draft Plan Review
Raum B0.KF2
| Vorstellung der wesentlichen Features durch POs anhand der Team Breakout Ansicht.
Aufwände
Abhängigkeiten?
Welche Features haben fachliche Deadlines im PI?
welche Features können im PI nicht umgesetzt werden? → Tag "PIXY" und "PIXY" in der Überschrift entfernen
Nennung der Draft Team PI Objectives 
| ART+ BOs
|
8 | 17:30 - 18:00
| Management Review & Problem Solving
Raum B0.KF2
| Gibt es Punkte, die die BOs dem TRIO zur Draft Plan Review für die Teams mitgeben wollen? Planungsanpassung nötig?
Risiken benennen, die BOs + Solution betreffen. 
zur Sicherheit: Risiken in den Team Reports durchsuchen
Bei Bedarf: Team Objectives anschauen
| BOs, TRIO, POs, SMs
|
PI Planning Tag 2
| Zeit | Thema | Inhalt | Wer |
1 | 09:00 - 09:15 | Recap vom Vorabend /Planning Adjustments
Bereich A.5.500
| Haben sich aus der Management Review und Problem Solving Planning Adjustments ergeben? | ART
|
2 | 09:15 - 11:00 | Team Breakout (III von IV) | Feature Breakdown: User Storys erstellen inkl. Schätzung
Welche Features sind out of Scope? 
Risiken erstellen und Verlinkung in Jira sicherstellen
Abhängigkeiten zu anderen Teams erstellen und verlinken
Objectives:Formulieren
Checkliste nutzen 
Fragen:
Passt unsere Auslastung zu unserer Kapazität?
____________________________________________________________
Termine in der Breakout
9:15-9:45 Gespräch mit den Trio, welche Themen wir als Objectives formulieren
10:15-10:30 Sync Trio, POs, SM Raum A.5.716
Fachliche Abhängigkeiten
Impediments & Risiken
Unklarheiten und Vereinbarung von Gesprächs-Slots
Evaluierung Planning Fortschritt des Teams
| AST |
4 | 11:30 - 12:30
| Mittagspause | Mittagessen im Casino |
|
5 | 12:30 -15:00 | Team Breakout (IV von IV)
inkl. BV Vergabe
| Finale Formulierung der Objectives
Vorschlag für Planned Business Value
Welche Features sind out of Scope?
Zwischen 14:00 - 15:00: Business Value Vergabe. 
Im Anschluss: Team Confidence Vote durchführen und eintragen
| AST + BOs |
6 | 15:00 - 16:30
| Final Plan & ART Confidence Vote
Raum A.5.500
| Recap (Trio) - 15 Minuten
Recap BV Vergabe (RTE)
ART Objectives für das PI38 (PM)
Risiken Zusammenfassung + Maßnahmen
POs stellen Team-Planung vor
ART Confidence Vote 
| ART + BOs
|
| 16:30
|
| ENDE DES PIPs 38
|
|
@@ -0,0 +1,28 @@
# Angaben Team AST für Bestellung eines Technischen Users
Version: 3 | Last modified: 2026-02-24T17:39:53.266+01:00
Source: confluence page ID 326896388
---
Notwendige Informationen:
Rolle | ABK | Person |
Antragsteller | AS | Kann Jeder sein
(zB. Externer kann für Internen bestellen) |
Führungskraft | G1 | Führungskraft Irina Volkmann: Vladimir Voicu |
CISO | G2 | DB Infrago Patrick Bolanz |
db.systel | RA | Ressourcen Administrator DB Service Account |
Bestellvorgang
|
|
Webseite |  https://prod.debi.comp.db.de/ |
IT Resource | 00001442 |
|
|
technischen User bestellen:
https://prod.debi.comp.db.de/
IT Resource: 00001442
@@ -0,0 +1,31 @@
# CoachLoops Team Buddies für Abwesenheiten
Version: 26 | Last modified: 2025-07-30T07:36:32.994+02:00
Source: confluence page ID 345066536
---
Jeder Scrum Master informiert die CoachLoops über geplante Urlaubszeiten/ Weiterbildung und erstellt einen entsprechenden Outlook-Termin.
Der Scrum Master, der in Urlaub geht, lädt seinen Buddy rechtzeitig vor dem Urlaub zum Meeting ein und bespricht die spezifischen Bedarfe und Besonderheiten des jeweiligen Teams.Team (Intern und Extern Stakeholders): Teamstimmung, Spirit, helfende Hände im Team und Herausforderungen, Kommunikation bedarf mit Stakeholders.
Daily: Standardmethode für Meetings, Bildschirmfreigabe, und das Umfange und die Notwendigkeit der Teilnahme und Unterstützung von PO/SM.
Review: Standardmethode für Meetings, Post-To-Dos in Confluence, Berichte zum Nachdenken.
Retro: Vorbereitung der Retrospektive- Board, Retro-Format, Dokumentation der Aktionsschritte und To-dos nach der Retro. 
Planning: Standardmethode für Meetings (Ziele und PBIs) DoR, Grad der Selbstorganisation, Backlog-Übersicht
Jeder Scrum Master sorgt dafür, dass der aktuelle Bedarf des jeweiligen Teams klar dokumentiert und der Vertretung zugänglich gemacht wird (z.B. Retro-Boards, Meeting-Regeln etc.)
Wir haben Vertretungs-Buddies, die die Aufgaben des abwesenden Scrum Masters übernehmen. Sollte auch der 1. Buddy ausfallen, greift der 2. Buddy. Die Aufteilung orientiert sich z.B. an TPS oder Eigenentwicklungs-Teams und mit dem Ziel die Teams zu kennen, dass die Teams ihre Scrum Master-Vertretung kennen und so langfristig eine sinnvolle Vertretung aufzubauen.
Bei Urlaub sollten keine offenen Aufgaben direkt an den Vertreter übergeben werden. Stattdessen wird sichergestellt, dass alle Aufgaben entweder vor dem Urlaub abgeschlossen oder so dokumentiert sind, dass die Vertretung diese übernehmen kann.
Bei spontanen Ausfälle (z.B. Krankheit) springt der Buddy ebenfalls ein. Der abwesende Scrum Master informiert nach Möglichkeit seinen Buddy über akute Bedarfe des Teams. Der Buddy kann z.B. bei PO/ Team anklopfen, springt in die Dailys ein. Genauso wie auch das Team weiß, an wen sie sich bei Fragen wenden können.
Buddy sprint (mind.) in das erste Daily des Teams und sagt Bescheid, dass er bei Fragen zur Verfügung steht.
 
Übersicht über die Buddies
Die Spalte "Besonderheiten" ist vor jeder geplanten Abwesenheit um eventuelle aktuelle Besonderheiten zu ergänzen.
Team + Scrum Master | Buddy
| Besonderheiten |
AST + Kristin | Oben | Infos aus CoachLoops-Runde über Daily ans Team, Ansprechbarkeit im Daily-Chat, ggf. Retro begleiten |
FOps + Oben | Kristin | PO in CoachLoops-Chat hinzufügen, ansonsten mit PO nach Bedarf, Infos aus CoachLoops Runde über Daily ans Team  |
InfraTEC + Johannes | Aymen | tbd Alle Meetings begleiten, Infos aus CoachLoops Runde über Daily ans Team  |
Babedas + Aymen | Johannes | Keine Meeting-Begleitung. Das macht wie gehabt entweder die PO oder jmd. aus dem Team.
Infos aus CoachLoops Runde über Daily ans Team 
|
PzE + Sören | Natalia | Infos aus CoachLoops Runde über Daily ans Team  |
@@ -0,0 +1,18 @@
# Eindrücke zur Team Olympiade
Version: 3 | Last modified: 2025-08-21T11:19:27.843+02:00
Source: confluence page ID 479303543
---
Marshmallow-Challenge
LEGO-Memory
Quiz-Duell
Pantomime & Zeichnen​
Wassertransport
Sieger Team Kamerun Â
@@ -0,0 +1,16 @@
# FOps - Das Team!
Version: 50 | Last modified: 2026-06-11T13:33:39.793+02:00
Source: confluence page ID 322196201
---
|
|
Quick-Links zu Unterseiten: 
|
|
Anfragen an das Teams über: 
| C2S.BARD.FOps@deutschebahn.com
|
@@ -0,0 +1,328 @@
# [PI 36] Team AST
Version: 51 | Last modified: 2025-09-16T13:52:06.779+02:00
Source: confluence page ID 412581482
---
Grobe Themengebiete für PI36 - Ziele nach aktueller Prio
Objective zu den Releases:
Durchführung von qualitätssichernden Releasetests und -abnahme, mit dem Ziel neue Funktionen fehlerfrei produktiv zu nehmen und damit einen effizienten baubetrieblichen Prozess zu gewährleisten.
Meilensteine:
ObjectivesObjective 1: Baubetroffenheiten 
Objective 2: BKE light
Objective 3: Wir testen für die Go Lives KW 
Objective 4: Universalschnittstelle
Objective 5: Investcontainer (Verknüpfungsfunktion)
Objective 6: Testautomatisierung 
O1: 
Die fBF kann die Universalschnittstelle aus dem ISM verwenden, um die Daten für neue Anmeldeobjekte inkl. Unterobjekte in BBPneo zu importieren, mit dem Ziel, dass z.B. die Doppeleingabe von Anmeldungen in PZE und BBPneo durch die Anmelder entfällt.
Vorschlag:
2 Objectives zu Spezifikationen (Objective 1&2)
1 zum Tests der Releases (Objective 3)
2 für konkrete, wichtige Fachlichkeiten, die wir Live nehmen (Objective 4&5)
1 für TA (Objective 6)
→ Spezifikationen erzeugen Business Value
→ Bessere Abbildung ...
Risiken & Abhängigkeiten
3
complete
Risiko
9
incomplete
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1226
37
incomplete
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1231
10
incomplete
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eAST-2933
21
incomplete
Fachbereiche müssen zeitlich passend die Importdaten für Test und go-live zur Verfügung stellen: 
22
incomplete
PzE Daten
23
incomplete
Investcontainer
34
incomplete
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1227
24
incomplete
Baubetroffene Züge
32
incomplete
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1228
6
incomplete
Abhängigkeiten
25
incomplete
FOPs wird benötigt um bestimmte Konfigurationen nach Rücksprache anzulegen (Nicht-Terminfreigabe o.ä.)
26
incomplete
Fachbereiche müssen zeitlich passend die Importdaten zur Verfügung stellen: 
27
incomplete
PzE Daten
28
incomplete
Investcontainer
29
incomplete
Baubetroffene Züge
30
incomplete
SB2 Kopien können nur durchgeführt werden, wenn die entsprechenden Personalien erreichbar sind. Unsere Arbeitsplanung ist nur valide, wenn die Arbeit im abgesprochenen Zeitraum stattfindet. 
| Prio in PI
| RisikenFeature
| Commit?
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Abschluss Feature in PI 36  möglich?
| Abhängigkeiten
| Risiken |
|
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1169
|
| Die fBF kann die Universalschnittstelle aus dem ISM verwenden, um die Daten für neue Anmeldeobjekte inkl. Unterobjekte in BBPneo zu importieren, mit dem Ziel, dass z.B. die Doppeleingabe von Anmeldungen in PZE und BBPneo durch die Anmelder entfällt. 
|
|
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1041
|
|
1 |
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1121
|
| Es wurde eine Funktion eingeführt, welche dem Anwender die neue Verknüpfungsart zwischen einer Container-Hülle und Bedarfsobjekten ermöglicht, mit dem Ziel die Anforderung aus ANNEX VII umzusetzen.
|
|
|
|
|
2 |
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1146
Aufwandsstorys erstellen
|
| Es wurde eine Importschnittstelle "baubetroffene Züge" spezifiziert, die es ermöglicht, aus einer bereitgestellten Importdatei die Werte nach BBPneo zu übernehmen und in der GUI an Anmeldeobjekten inkl. Unterobjekten angezeigt werden. |
|
| altes Feature  das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1075
|
|
3 |
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1148
|
|
|
|
|
|
|
4 |
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1034
prüfen, ob das Feature aus fachlicher Sicht noch aktuell ist
|
| Analyse zur vereinfachten Berechnung und Anzeige der BKE Kategorie in BBPneo als Grundlage für eine reibungslose Spezifikation ist abgeschlossen
|
|
|
|
|
6 |
| Baufreiheiten
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1219
|
| Vorabinfo: die Import-SST für die Bautakte und auch die neue Universall-SST können keine Baufreiheiten entgegennehmen. 
großer fachlicher Entscheider WS findet am 15.04.2025 statt, danach können die Aufwände für Team AST abhängig von der Anforderung und der Dringlichkeit abgeleitet werden.
|
|
|
|
|
7 |
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1188
|
|  
|
|
|
|
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1217
|
|  
|
|
|
|
|
| wichtig, aber kein Fokus Thema |
|
|  
|
|
|
|
|
8 |
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1213
|
|
| Anpassung der Kleinigkeiten beim Schattenfinder
Umsetzung (Test) von der Datumseingabe
|
|
|
|
9 |
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1171
|
|
| Abschließende Klärung wie die Nicht-Terminfreigabe erfolgen soll
Umsetzung der Konfig
Test
|
|
|
|
11 |
|
|
|
|
|
|
|
|
12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Testautomatisierung
| Prio in PI | Feature | Zuständigkeit | Commit? | vorhandenes Objective / Idee Objective | Inhalt/offene Tätigkeiten | Abschluss Feature in PI 36  möglich? | Abhängigkeiten |
1 |
| das I.NVI IT Lifecycle Management Toolissuekey,summarykey,summaryd1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1131
| AST/FOPS
|
| Go-Live von weiteren 10 bestehenden autom. Reg.-Testfällen, sowie Optimierung durch Implementierung von Rollen/User spezifischen und parallelisierten Testens für den Abbau der manuellen Testaufwände, um den Nutzern die neuen Funktionen schneller und qualitativ hochwertiger zur Verfügung zu stellen. | das I.NVI IT Lifecycle Management Toolcustomfield_24101Checklists20key = C2SBBP-1131 d1143f0d-33c0-3f1c-b44b-7720150f306e
| ✔️ |
|
2 |
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1137
| AST
|
| Go-Live von weiteren 10 bestehenden autom. Reg.-Testfällen, sowie Optimierung durch Implementierung von Rollen/User spezifischen und parallelisierten Testens für den Abbau der manuellen Testaufwände, um den Nutzern die neuen Funktionen schneller und qualitativ hochwertiger zur Verfügung zu stellen. | das I.NVI IT Lifecycle Management Toolcustomfield_24101Checklists20key = C2SBBP-1137 d1143f0d-33c0-3f1c-b44b-7720150f306e
| ✔️ |
|
3 |
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1140
| AST/FOPS
|
| Go-Live von weiteren 10 bestehenden autom. Reg.-Testfällen, sowie Optimierung durch Implementierung von Rollen/User spezifischen und parallelisierten Testens für den Abbau der manuellen Testaufwände, um den Nutzern die neuen Funktionen schneller und qualitativ hochwertiger zur Verfügung zu stellen. | das I.NVI IT Lifecycle Management Toolcustomfield_24101Checklists20key = C2SBBP-1140 d1143f0d-33c0-3f1c-b44b-7720150f306e
| ✔️ |
|
4 | Gewünscht von Jörg | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1141
| AST/FOPS
|
| Go-Live von weiteren 10 bestehenden autom. Reg.-Testfällen, sowie Optimierung durch Implementierung von Rollen/User spezifischen und parallelisierten Testens für den Abbau der manuellen Testaufwände, um den Nutzern die neuen Funktionen schneller und qualitativ hochwertiger zur Verfügung zu stellen. | das I.NVI IT Lifecycle Management Toolcustomfield_24101Checklists20key = C2SBBP-1141 d1143f0d-33c0-3f1c-b44b-7720150f306e
| ✔️ | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1140
|
5 |
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1139
| Josephine, Carsten, Frank
Zuarbeit Jens Florian |
| Go-Live von weiteren 10 bestehenden autom. Reg.-Testfällen, sowie Optimierung durch Implementierung von Rollen/User spezifischen und parallelisierten Testens für den Abbau der manuellen Testaufwände, um den Nutzern die neuen Funktionen schneller und qualitativ hochwertiger zur Verfügung zu stellen. | das I.NVI IT Lifecycle Management Toolcustomfield_24101Checklists20key = C2SBBP-1139 d1143f0d-33c0-3f1c-b44b-7720150f306e
| ✔️ |
|
@@ -0,0 +1,464 @@
# [PI 37] Team PIP
Version: 103 | Last modified: 2025-06-26T12:29:49.219+02:00
Source: confluence page ID 445491844
---
Grobe Themengebiete für PI37 - Ziele nach aktueller PrioLieferung KW26 - 27.06.2025 . go-live 20.07.2025Universalschnittstelle PzE + Investcontainer
Investcontainer Verknüpfung + Überdeckung
Lieferung KW31 - 01.08.2025 - go-live TBD
Lieferung KW35 - entfällt
Lieferung KW39 -26.09.2025- go-live TBD
Überarbeitung Baumansicht - nur Analyse
Komfortfunktionen Mikroskopische Verortung - nur Analyse
SE/IAV Defaultwerte korrigieren
Performance Schattenfinder
Objectivesdas I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3039
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-2940
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-2941
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3166
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3034
Risiken & Abhängigkeiten
3
incomplete
Risiko
23
614b1ea7-2dad-4a53-af65-91a7851448e5
incomplete
Importe auch unter der Woche ausführen Import SST, sonst Zeitleiste fraglich
24
9eff88c8-9aa7-489c-95f6-faef43d5375d
incomplete
Seite mit dem neuen Risiko-Syntax und der Beschreibung: Risk Management BARD - C2S | BARD | ART - ariJa Confluence
6
incomplete
Abhängigkeit
10
incomplete
BKE - was braucht BaBeDas?
11
incomplete
FOPS Unterstützung go-live Investcontainer
12
incomplete
Schulungen - welche Kapa von Peter / Monika?
14
incomplete
BOA Tätigkeiten? Haben wir hier ein To Do? Ticket 2922
18
85d36d9a-055b-41d6-b4cc-204ab126286b
incomplete
ÄvG - mit FOPS klären > siehe Mailverkehr
20
16cbbb6e-b4c6-41ac-ba3a-60d430d10c2b
incomplete
geplante Betra CRs für Testing und Test Design einpflegen
Themen nach Prio sortiert
Prio in PI
| Typ
| Feature
| Wer? Entscheidung im PIP
| Commit?
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Abschluss Feature in PI 37  möglich?
| Abhängigkeiten
| Risiken
|
1 | Test + Support
| go-live Universalschnittstelle für Investcontainerdas I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1169
| Team 1 Person / Unterstützung PO
 
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3039
| alle offenen Themen rund um go-live bestimmen und durchführen
Importtests durchführen - Vollversion
UAT?
siehe bereits vorhandene Sprinttickets
| Ja | Datenlieferung
|
|
2 | Test + Support
| go-live PzE Schnittstelledas I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1169
| Team 1 Person / Unterstützung PO
 
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3039
| alle offenen Themen rund um go-live bestimmen und durchführen
WF für PzE Objekte erstellen und vertesten
Importtests durchführen - Vollversion
siehe bereits vorhandene Sprinttickets
Anfrage von Sören besprechen (nach Rücksprache mit Carla)
Anfrage von Alfredo bearbeiten (Rücksprache mit Carla)
250250
| ja | Datenlieferung - Produktive Daten für Investcontainer können erst Ende August übergeben werden, da vorher der Prozess nicht abgeschlossen ist.
|
|
3 | Support
| go-live Investcontainer (Verknüpfung + Überdeckung)
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1121
| Team 1 Person / Unterstützung PO
 
Participants:  
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-2940
| alle offenen Themen rund um go-live bestimmen und durchführen
UAT?
| ja | Konfig aus Fachbereich
|
|
| Konfig/Test?
| Umsetzung BOA im n-1 schon nutzen, neuer WF > DL Mixe mit Daniel Pöhle
|
|
| Wir? FOPS?
| welches To Do hat AST hier, wenn überhaupt?WF Design muss noch vorgelegt werden > Termine Sabine + Tanja Kämper am 27.06.2025 |
|
|
|
| Spez
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1291
| 2 Personen Team
 
 
Participants: Monika (fachlich) + Peter
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3166
| Analyse
Spez
250
|
|
|
|
4 | Test
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1128
| Team alle |
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-2941
| Cases siehe Backlog
| ja | HaCon
|
|
5 | Test
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1267
| Team alle / Betra Tests neu verteilen → Esther, Valeria und Nataliia
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-2941
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3040
| Cases siehe Backlog
| ja | HaCon
|
|
6 | Spez
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1269
| 1 Person
 
 
Participants: Monika
|
|  
| Spezifikation mit Ziel KW39, alternativ 43
optional Testdesign noch in diesem PI
| ja | --
|
|
7 | Analyse
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1264das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eLPM-1544
| PO, perspektivisch +1 Person Team
Participants:  
|
| mögliches Teamobjective
| Termin BaBeDas und HaCon ausstehend - Sabine organisiertfachliches Problem: wir wissen nicht, welche Gleise betroffen sind
HAKO Austausch zur Übergabe der Mikroskopie
Nach dem Termin zu klären: was sind die Möglichkeiten und damit Tätigkeiten, die sich hieraus für das Team ergeben?
Termin am 07. Juli mit Hacon ausstehend
Pufferticket von 2 SP einplanen pro Sprint
| ja | Ergebnisse aus Initialtermin
|
|
9 | Analyse
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1265
| nur PO, Valeria
|
|
| Baufreiheiten in BBPneo (Carla)
BKE Berechnung unterstützen (Carla?)
makroskopische Ausrichtung der BSt gleisscharf (Monika)
KM in BBR (Monika)
Unterstützung Strategie Trio durch Valeria - wie viel % wird Valeria hier eingesetzt?
....
| ja, Aufwandsfeature |
|
|
10 | Analyse
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1266
| 2 Personen Team
 ,
,  
  
|
|
| FBF Tickets konsolidieren
laut Monika auch mit zu berücksichtigen: FBFBBPNEO-3087 - "Gebündelte tVE" kenntlich machen. (aus Anwenderecho) Evt. 10 % PI 33 oder sogar Thema aus Userumfrage 2024:    
Themenstränge und Probleme aufbereiten
offen Fragen notieren
Lösungskonzept erarbeiten
evtl OOS: Rücksprache mit Anwendern (soll erst mit Konzept geschehen)
| Ja |
|
|
11
| Spez
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1273
| 2 Personen Team
 
|
|
| Analyse/Rücksprache: gibt es weitere Punkte, die beim Kopieren angepasst werden müssten?
Spez bei AST
Alfredo und Benjamin definieren eine Anf. an BBPneo zum verändernden Verhalten beim Kopieren von den den Anmeldungen/ BBMN/tVE /bVE: gewünschtes Verhalten, eine Abfrage an die Nutzer, ob die SE und IA Informationen übernommen werden sollen. Das Risiko ist bekannt, dass dabei automatisch nicht relevante Elemente mit kopiert und weitergeben werden.
Alfredo und Benjamin definieren eine neue Anforderung: Setzen der Checkboxen für die Logisitikgleise/ SE und IA automatisch auf "nein" beim Erstellen von neuen Objekten.
Die User werden noch mal auf die Kopierfunktion von den ausgewählten SE und IA Elementen hingewiesen, um temporär bis zur Umsetzung der neuen Anforderung den Aufwand zu reduzieren. Alfredo Lorenz Sadi Wenzel und Alexandra Werning wer nimmt das To-Do mit?
Hier sind die Werte ersichtlich, welche aus BBPneo für IA im Babsi Export enthalten sind:
Hier sind die Werte ersichtlich, welche aus BBPneo für SE im Babsi XML Export enthalten sind:
| ja |
|
|
12 | Weiterentwicklung
| Testautomatisierung
Feature wird von Natalia erstellt
|  
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3034
|
|
| InfraTec
|
|
13 | Support
| Aufwände Schulungen (Umgebungsmanagement + Unterstützung Anmelderschulung)
Sammler PI37 operative und ungeplante Arbeiten
| ,
,
 
|
|  
| Zum PI erforderliche Unterstützungskapa abfragen
| Ja |
|
|
14 | Support
| OSB BOB Workaround weiter ausführen?
Sammler PI37 operative und ungeplante Arbeiten
| ,  
|
|  
| Absprache mit FOPs + BARD Sync
| Ja |
|
|
15 | Support
| FBF Unterstützung
Sammler PI37 operative und ungeplante Arbeiten
| , ,  
 
|
|  
|
| ja |
|
|
16
| Support
| Kopieraktionen Esther
Sammler PI37 operative und ungeplante Arbeiten
|  
|
|
| wie oft?
| ja
|
|
|
17
|
| SDT 120
Sammler PI37 operative und ungeplante Arbeiten
|  
|
|
| Tätigkeiten erst ab ca. S4 
Überarbeitung Test Design
Absprache mit FOPs
Tätigkeit ab S1
Prüfen, ob die Datenübernahme neuer Segmentierung mittels Skript weiterhin möglich ist (Infratec - Kaan)
|
|
|
|
|
| Analyse
| Schichten
|
|
|
| Schichtdauer 23:59 (kein aktuelles Ticket vorhanden), Infos hier:Absprache mit Betra
ggf Nachspez
Rücksprachen mit SST Systemen
AST-16 IRS-86665: Interpretation von Schichten anpassen (Ende <= Anfang) (Spezifikation)
AST-2515 Anpassung von Unterobjekten zur Kopie Baufokuswochen bei falsch ausgewählter Schichtart "schichtweise" in der Produktion 
IRS-76333 - CR XXX: Es soll eine zusätzliche Schichtart "Schichtweise mit VT" eingeführt werden (Spezifikation)
|
|
|
|
| Analyse | SST Systeme |
|
|
| BOA (Analyse) IRS-87453: CR XXX: BOA Definierte Unterbrechungen an bVE übergeben.
BOA Ausfalltage
AST-304: Behebung bekannter BOA-Fehler
Erstellung einer Versionenänderung für BBP-XML
(Klärung mit SST-Patnern) TCSM16-3807 CR XXX: Automatische Übergabe von BBMN an das FTG Verzeichnis
|
|
|
|
? | Analyse
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-210
|
|
|
| Trio klären: AST oder FOPs? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
@@ -0,0 +1,493 @@
# [PI 38] Team AST
Version: 73 | Last modified: 2025-09-17T15:56:02.542+02:00
Source: confluence page ID 464843627
---
Grobe Themengebiete für PI38 - Ziele nach aktueller Prio
Objectivesdas I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3448
Schattenfinder Invest-Container?
UNCOMMITTED: Import von Baubetroffenen Zügen (Info-Flussvereinbarung fehlt)
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3301
Objective : TESTAUTOMATISIERUNG
Risiken & Abhängigkeiten
3
incomplete
Risiko
6
incomplete
Abhängigkeit
9
8412134c-8df0-4ad7-8a6e-e830a9483e57
incomplete
FOPS:
10
30ce5243-1365-400e-8cc4-a99b795219c9
incomplete
AST-3451 Verbundtest OSB BOB
12
11403645-ade7-4968-b1b2-b8e1195c38de
incomplete
fbf Absprachen
19
f32e18fe-19b2-433c-ac90-94d324259143
incomplete
Jörg CRs?
23
78acbb00-f8f2-4c43-91e6-f85d1e67b5d4
incomplete
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eINFRA-2145
24
92c2b649-86ae-41b7-a358-3604e4aa83bd
incomplete
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eINFRA-2146
20
9b9620fc-70ff-41da-bc38-d5f218d0bbb1
incomplete
alles rund um Fristen
14
d6eb099f-3ba9-4ae6-aaa9-8e8a18df74a4
incomplete
Betra Tickets klären
16
92b2b4d6-e4e0-45ed-b0c7-980bbcf2a077
incomplete
4227 spez mit Esther
| Feature
| Commit?
| Wer
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Abschluss Feature in PI 3/ möglich?
| Abhängigkeiten
| Risiken
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1324
|
|  
 
|
| Use Case: nach ISS Update entstehen Inkonsistenzen, diese müssten in allen Containern behoben werden. Idee ist hier, die Inkonsistenz einmal zu beheben und an alle Kopien die aus XY entstanden sind, die korrigierte Mikroskopie zu vererben, damit der Arbeitsaufwand reduziert wird
Fachlicher Ansprechpartner?Anmeldeeinheiten: TBD
rKBB/zKBB- Carla hat bereits mit Benjamin gesprochen - sinnvoll uns muss auch für bVEn berücksichtigt werden
Fachbereiche noch mal generisch denken lassen: macht eine Funktion "Mikroskopie kopieren und/oder vererben an" auch für nicht-Containerobjekte Sinn?
wie viele Container müssen tatsächlich händisch angepasst werden und wie viele werden durch unseren Behebungsalgorithmus bereits bereinigt?
|
|
|
|
1 | Lieferung KW 39
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1146
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1034das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1270das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1060
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1175
|
| Team alle
|
| Testing
Defectmanagement
|
| Folgeaufwände bei FOPS?
|
|
2 | Lieferung KW 43
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1269
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1213
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-776
|
| Team alle |
| Testing
Defectmanagement
|
| Folgeaufwände bei FOPS?
|
|
3 | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1266
|
|  
 
|
| Termin: Sabine nach fertiger Analyse das Konzept, was spezfiziert werden soll, vorstellen
wenn ok, dann spez
|
| Folgeaufwände bei FOPS?
|
|
4 | GEBLOCKT, da keine konkreten  Anforderungen vorliegen
BAUFREIHEITEN
|
|
|
| Soll das überhaupt umgesetzt werden? bisher keine Anforderungen vorhanden, aber potenziell wird es wieder eilig
Ziel wäre schon August '26
Kein konkreter fachlicher Ansprechpartner bekannt
|
|
|
|
5 | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1362
Stand 09.09.: GEBLOCKT für PI38, da keine konkreten  Anforderungen vorliegen
|
| Aus meiner Sicht muss das Thema mindestens zu 50% bei FOPS liegen
|
| Doku aus erstem Termin (bei dem Carla dabei war)
https://arija-confluence.jaas.service.deutschebahn.com/x/XhfpH
BBMN sollen im System sein, dass sie außerhalb von Fristen angelegt werden könnenkönnen/sollen nur BBMN angelegt werden? klassisch gibt es eigentlich nicht nur eine BBMN
welcher WF (unklar)
ggf. generische Lösung: ist es möglich, ein Anmeldefenster nur für bestimmte Personen oder Personengruppen freischalten zu lassen
Ansprechpartner:sonstiger Ansprechpartner unklar
IA mit abholen, was müssen sie hier monitoren?
|
|
|
|
6 | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1369
|
|  +  
|
| Welches Release ist realistisch?
Spezifikation notwendig
Fachlicher Hintergrund:tVE und bVE haben aktuell keine Wirkrichtung, im Bahnhof kann diese auch nicht sinnvoll ausgegeben werden
eine Wirkrichtung hat bisher nur die BBR
in den ISS Angaben ist keine Richtungsangabe vorhanden, daher kann es nicht "einfach" ausgelesen werden
aus SB2 Mail Lea, Analyse war in PI37 siehe hier
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3238
Anforderer/Ansprechpartner Christian Rucho
Schritte in PI38Review mit Christian: wäre das der Wunsch gemäß SB2
Rücksprache mit Anwendern halten bevor spezifiziert wird? Steht uns das zu? falls nicht über Trio laufen lassen.
Rücksprache mit den betroffenen Prozessphasenbetreuern + betroffenen Anwendergruppen (rKBB, zKBB)
klären: ist hier eine Rücksprache mit dem Fahrplan notwendig?
|
| keine Zusatzaufwände bei FOPS absehbar.
|
|
7 | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1389
|
|  +  
|
| Review mit Christian Rucho
Fachlicher Hintergrund:bisher findet keine Validierung von KM Angaben in den Fachobjekten statt
hierdurch entstehen Probleme bei der Identifizierung von Projekten zu BBRn
  Tickets erstellen und Monika fügt Analyse hinzu
Spezifikation wenn möglich Start in PI38
|
|
|
|
8 | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1368
Fokus nicht nur auf inaktive Objekte in Zusammenhang mit Gültigkeit, sondern allgemein wie werden inaktive Objekte berücksichtigt
Erst mal nur Analyse, dann Spez.
|
| Welches Release ist realistisch?
 
 
|
| Ansprechpartner Alfredo
Termin mit Fachbereich notwendig
Fristigkeit nur im KKM ein Thema
Per Konfig lösbar mit Aneesh:Terminberechnung hinsichtlich koordinierter Zeiten, Auswahl der Variante
Offen:Umgang mit inaktiven Objekten
auch Tickets: 10113 und 9622 
weitere Fälle müssen noch ausgearbeitet werden, FOPS sollte hier involviert werden, weil die im Zweifelsfall auch weitere Themen rund um inaktive Objekte in Bezug auf Gültigkeiten kennen
Abgleich mit der Richtlinie 406
Bei eventuellen Fragen Benjamin Kretz (Fops) ansprechen.
|
| Fristigkeit soll Aneesh in PI 38 vorgenommen werden > bestimmte Szenarien können per Konfig gelöst werden >>> Monika unterstützt
|
|
9 | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1335
|
|  
 
 
|
| Abschluss Analyse
Spezifikation für Kostenschätzung
|
| Aufwände bei FOPS?
|
|
10 | das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1341
|
|  
 
|
| Doku bitte hier https://arija-confluence.jaas.service.deutschebahn.com/spaces/C2SBBPneo/pages/472809803/PzE+Datenimport+Fahrplanjahr+2028
Planung für PI38
PI38 User Umfrage Nutzung PzE erstellen
PI38 (PzE, BBPneo) VE Arten zwischen den Systemen ab/angleichen?
PI38 (PzE, BBPneo): Art der Arbeiten prüfen (Analyse & Einfach Anpassungen)
PI38 (PzE, BBPneo) Mapping Projektnummern verfeinern (z.B. IH, Extern, Großprojekt, Eisenbahnkreuzungsgesetz) & gebildete Projektnummern (Ex_) (PzE)
(PzE) Verkehrstage Übertragung - in PzE bereits früher pflegen lassen, da Übertragung möglich
(PzE, BBPneo) Leistungsmengeneinheiten prüfen, PI38 (PzE) Summe Leistungsmengen in PzE
PI38 (PzE, BBPneo) Sperrzeitbedarf vs. Datum (ggf. abhängig zu "Flexibler Zeitraum", siehe unten)
Prüfung für PI38 im gemeinsamen PIP-Termin
(PzE): Vorschau des Objekts in BBPneo (z.B. "User ist nicht bekannt") → "kann (nicht) übertragen werden" 
PI38: Workflow PzE Entwurf
PI39: Zwischentests - IAV & SE Datenanalyse: Ursache zu Abweichungen zwischen Systemen & Lösungsoptionen entwickeln
Automatisierung der Log-Auswertung (Skript? ggf. Marco fragen?) >>> Importlog überarbeiten; Defects anhängig
Terminserie mit Valeria 1x die Woche vereinbaren
|
| PzE - Rücksprache über geplantes Vorgehen Meetings und Aufwände prüfen
Bitte Aufgaben den Sprints zuteilen!
Folgeaufwände bei FOPS?
|
|
11 | TA Umsetzung weiterer Testfälle
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1339
|  
 
 
|
| 11 bei AST, Rest bei Betra
Jens Florian sondiert mit AST Kollegen im PIP, welche TF angegangen werden sollen
|
|
|
|
12 | TA - Paralleles Testen
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1141
|  
|
| Performance der Testdurchführung verbessern
Tests laufen gerade nacheinander, könnten parallelisiert werden
wird über Selenium umgesetzt
|
|
|
|
13 | TA - Umstellung Chrome auf Edge
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1135
|  
|
| Pipeline muss auf Edge umgestellt werden, derzeit läuft es nur auf Chrome
Lokal kann bereits auf Edge getestet werdenLokal können beide Browser getestet werden, aber nicht in der Pipeline
|
|
|
|
14 | Sammler Operative und ungeplante Tätigkeiten
|
| Team alle |
| FBF Unterstützung
Analysethemen aus PROD
Sonstiges...
|
| Folgeaufwände bei FOPS?
|
|
Unterhalb der Linie, Themen die gezogen werden können, wenn noch Langeweile/Kapa vorherrscht
|
| Strukturtest Regression bei Überdeckung usw.
|
|
|
| Gesamtabgleich via Exporten, ob Werte grundsätzlich geändert wurden
|
|
|
|
| Prozessklärung/ Weitere Schritte BKE Berechnung
|
| Carla
|
| Status' aktivieren
Rücksprache Fachbereich: fachlichen Prozess für Nutzung der neuen Implementierungen zu BKE light und voll klären
|
| FOPS, BaBeDas, AST
Folgeaufwände bei FOPS?
|
|
| Themen aus Shortlist FOPS
|
|
|
| Shortlist liegt hier
|
|
|
|
| TCSM16-4138    Die Sortierung der SE-Gleise wird falsch durchgeführt (immer nach der ersten Zahl)
|
|
|
| kann man Sortierung allgemein angehen? sollte man das?
|
|
|
|
| To Do Regeln überarbeiten?
|
|
|
| siehe auch Alfredo Thema oben
|
|
|
|
| PRÜFEN OB GESAMT-ÜBERHOLUNG DER TO DO REGELN
|
| Welches Release ist realistisch?
|
| Ansprechpartner: Alfredo
Soll-Termine in To Do Liste anzeigen
zum aktuellen Sachstand befragen // kann FOPS hier übernehmen?
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eFBFBBPNEO-10722
|
|
|
|
| Wenn große Themen platzen, Verknüpfungsansicht überarbeiten ?das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eFBFBBPNEO-11227
| Ticket nur als Beispiel
|
|
| Wenn Baufreiheiten platzen und/oder Havariefälle, gleiches Vorgehen wie bei Baumansicht: ein PI Analyse, ein PI Spez
|
|
|
|
18 | Aufwände AST Bau
|
|
|
| Weiterverfolgen(Nicht-)Terminfreigabe
Anschluss und Vorgangsnummern
|
|
|
|
@@ -0,0 +1,177 @@
# PI 39 Ablauf Team AST
Version: 1 | Last modified: 2025-11-27T14:19:20.823+01:00
Source: confluence page ID 517789879
---
{"generalSettings":{"tabSpacing":3,"tabWidth":100,"tabHeight":65,"direction":"horizontal"},"activeSettings":{"backgroundColor":{"color":"#040081"},"text":{"fontSize":36,"color":"#fff","textAlign":"left","fontWeight":"normal"}},"inactiveSettings":{"backgroundColor":{"color":"#f4f5f7"},"text":{"fontSize":18,"color":"#5e6c84","textAlign":"left","fontWeight":"lighter"}},"contentSettings":{"backgroundColor":{"color":"#fff"},"boxShadow":{"shadows":[{"color":"rgba(0, 0, 0, 0.2)","x":0,"y":1,"blur":6,"spread":0},{"color":"rgba(0, 0, 0, 0.4)","x":0,"y":12,"blur":4,"spread":-10}]},"border":{"style":"solid","width":1,"top":false,"bottom":true,"left":true,"right":true,"color":"#f4f5f7"},"padding":{"top":15,"right":15,"bottom":15,"left":15}},"hoverSettings":{"backgroundColor":{"color":"#dfe1e6"},"text":{"fontSize":18,"color":"#5e6c84","textAlign":"left","fontWeight":"lighter"}}}1
PI Planning Tag 1
| Zeit | Thema | Inhalt | Wer |
1 | 09:00 - 09:30
| Business Context C2S
A.5.100
| Wir schauen Business Context gemeinsam über Großmonitor
| ART |
2 | 09:30 - 10:30
| BARD Business Context und Architekturvision
A.5.100
| Begrüßung
Agenda v.a. Änderungen und WHY zur Teilnahme (Natalia)
Planungsprämissen PI 39 & Inhaltlicher Scope (PM, SA)
Blick auf die Features in Jira über das Kanban Board.
BBPneo und BETRA Release-Planung: Zeitplan Validierung
Babedas Release-Planung
Link auf PPT-Folien vom TRIO
| ART
|
3 | 10:30 - 13:00 | Team Breakout Sessions (I von IV)
A.3.400
| Features je Team in priorisierter Reihenfolge vorstellen 
Fachliche Deadlines (Spez/Meilenstein) anschauen
Gesprächsbedarfe mit anderen Teams/Trio
Aufteilung der Themen 
Breakdown der User Stories Stories erstellen und beschreiben
Personen zuordnen
Erste Schätzung abgeben 
________________________________________________________________
Termine in Breakout I
| AST |
4 | 13:00 - 14:00 | Mittagspause
A.5.100
| Gemeinsames Pizza essen | Alle |
6 | 14:00 - 16:30  | Team Breakout (II von IV)
A.3.400
| Feature Breakdown: User Storys erstellen inkl. Schätzung und in Jira verlinken
Risiken erstellen und Verlinkung in Jira sicherstellen
Abhängigkeiten zu anderen Teams erstellen und verlinken
wenn möglich groben Entwurf Objectives erstellen
Ziel: zum Draft Plan Review 
die POs über die Team Breakout Ansicht in Hive (bitte Teamauswahl beachten) und ggfs. (Draft) Team Objectives anhand vom ART Report vor.
Beantworten bis Mi, 16:30:
Welche fachlichen Deadlines gibt es in diesem PI? Welche Risiken sehen wir?
Ist die Releaseplanung für uns so durchführbar? Welche Risiken sehen wir?
Welche Features schaffen wir nicht in diesem PI?
Wo sehen wir Abhängigkeiten? (Wenn wir das machen wollen, muss vorher ... passiert sein.)
Welche Risiken sehen wir sonst?
____________________________________________________________________
Termine in Breakout II
 ??? Sync mit HaCon bzgl. der anstehenden Releases
15:00-15:15: Sync TRIO + POs + SMs (Raum A.3.416)
Fachliche Abhängigkeiten
Impediments & Risiken
Vereinbarung von Gesprächs-Slots 
Evaluierung Planning Fortschritt des Teams
| AST |
7 | 16.30 - 17.30
| Draft Plan Review: Vorstellung Entwurf PI-Planung
A.5.100
| Vorstellung der wesentlichen Features durch POs anhand der Team Breakout Ansicht.
Welche Aufwände eingeplant?
Mit welchen Teams Abhängigkeiten?
Welche Features haben fachliche Deadlines (Meilenstein oder Spez.-Abhängigkeit), die im PI selbst liegen?
welche Features können im PI nicht umgesetzt werden? → Tag "PIXY" und "PIXY" in der Überschrift entfernen
| Alle + BOs
|
8 | 17:30 - 18:00
| Management Review & Problem Solving
A.5.100
| Gibt es Punkte, die die BOs dem TRIO zur Draft Plan Review für die Teams mitgeben wollen? Planungsanpassung nötig?
Risiken benennen, die BOs + Solution betreffen. 
zur Sicherheit: Risiken in den Team Reports durchsuchen
Bei Bedarf: Team Objectives anschauen
| BOs, TRIO, POs, SMs
|
PI Planning Tag 2
| Zeit | Thema | Inhalt | Wer |
1 | 09:00 - 09:15 | Recap vom Vorabend /Planning Adjustments
A.5.100
| Vorstellung der Risiken und Maßnahmen aus der Management Review und Problem Solving Session.
→ Bitte mit in die Planung aufnehmen
| ART
|
2 | 09:15 - 11:30 | Team Breakout (III von IV)
A.3.400
| Feature Breakdown: User Storys erstellen inkl. Schätzung
Welche Features sind out of Scope? 
Risiken erstellen und Verlinkung in Jira sicherstellen
Abhängigkeiten zu anderen Teams erstellen und verlinken
Objectives:Formulieren
Checkliste nutzen 
Fragen:
Passt unsere Auslastung zu unserer Kapazität?
neu! Sprint 1 starten 
____________________________________________________________
Termine in der Breakout
10:15-10:30: Sync TRIO + SM + POs (A.3.416)
Fachliche Abhängigkeiten
Impediments & Risiken
Unklarheiten und Vereinbarung von Gesprächs-Slots
Evaluierung Planning Fortschritt des Teams
| AST |
4 | 11:30 - 12:30
| Mittagspause | Mittagessen im Casino | ART |
5 | 12:30 -15:15 | Team Breakout (IV von IV)
A.3.400
inkl. BV Vergabe
Start in A.3.416
| Finale Formulierung der Objectives
Vorschlag für Planned Business Value
Welche Features sind out of Scope?
Zwischen 14:00 - 15:00: Business Value Vergabe. 
Im Anschluss: Team Confidence Vote durchführen und eintragen
| AST |
6 | 15:15 - 16:00
| Final Plan Review
A.5.100
| Recap (Trio) - 15 Minuten
Recap BV Vergabe (RTE)
ART Objectives für das PI39 (PM)
Risiken Zusammenfassung + Maßnahmen (Vorstellung durch Risk Owner) (Co-RTE)
POs fassen für ihr Team die Planung zusammen über die Team Reports View (5 Minuten je Team)
Features benennen die nicht eingeplant wurden (Delta)
| Alle + BOs
|
7 | 16:00 - 16:30
| ART Confidence Vote & PIP Retro
A.5.100
| Ausfüllen Feedback-Wall als Basis für künftige Verbesserungen
ART Confidence Vote vor Ort - 15 Minuten
durchführen und eintragen 
 
| Alle
|
| 16:30
|
| ENDE DES PIPs 39
|
|
|
|
|
|
|
@@ -0,0 +1,282 @@
# [PI 39] Team AST
Version: 40 | Last modified: 2026-02-18T07:55:19.004+01:00
Source: confluence page ID 482496714
---
Grobe Themengebiete für PI39 - Ziele nach aktueller Prio
ObjectivesObjective 1: das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3710
Objective 2: das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3711
Objective 3: das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3713
Objective 4: das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3712
Objective 5: Massenfunktion Mikroskopie kopieren zur Inkonsistenzbehebung fertig spezifiziert (Ausbaustufe 1+2) / Navigationsbaum?
Risiken & Abhängigkeiten
3
incomplete
Risiko
9
57f9c8cd-3771-427c-9336-bca6324dcf0b
incomplete
Spez Deadlines können nicht gehalten werden, Anforderung Baufreiheiten völlig unklar
12
568344ae-907a-4084-9d7e-3075d517f2c6
incomplete
Zielsetzung Investcontainer unklar
14
d09cf496-6fcf-4b06-97a8-a5301a1c2174
incomplete
Monika nicht da, wenn tiefergehendes Fachwissen gebraucht wird, kommen wir hier in Schwierigkeiten
6
incomplete
Abhängigkeit
10
b896a6b5-5aad-4b0d-9b92-193ea1e5d68b
incomplete
Anforderung Fachbereich unklar
17
6822dea0-fc1a-4c8a-95a7-0bde613825fa
incomplete
User Umfrage - gemeinsame Bearbeitung PzE & BBPneo, v.a. Auswertung von Anforderungen
18
841f1395-bfe8-4515-a2ca-368cd8c3f015
incomplete
PzE-BBPneo gemeinsame Planung für nächsten Import 2026
Risiken-Syntax:
"Aufgrund von [Ursache] besteht das Risiko, dass [Risiko], was dazu führen könnte, dass [Effekt], wodurch [messbarer Impact] entsteht."
Deadlines:
BKE Thema geht im Mai live, PI39 endet zwar im März, es sollten aber alle Abhängigkeiten und offenen Themen bis Ende PI39 offengelegt seinSpez Import von BKE Kategorien ist zu klären (Deadline Mai)
10.02.   Spez Deadline für KW27Baufreiheiten CR
Investcontainer > Anforderungsdoc muss überhaupt erst mal eingereicht werden
...
Prio in PI | Feature
| Commit?
| Wer
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Deadline für das Thema
| Abhängigkeiten
| Risiken
|
Themen die aus PI 38 weitergetrieben werden müssen
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1266
|
| Monika, Valeria, Peter
|
| TCSM16-4360-Anpassungen im Baum vornehmen (Symbole und Sortieren) → Diskussion mit FachanwenderInnen anschließen und Spez finalisieren; höchste Komplexität der Navigationsbaum-Cases
TCSM16-4368-Anpassungen im Baum vornehmen (Breite der Baumansicht) → Entscheidung zur (Nicht-)Umsetzung treffen und ggf. fertig spezifizieren
TCSM16-4369-Anpassungen im Baum vornehmen (Dialogfeld Prüfauftrag) → Spezifikation und Freigabe
| Bitte eintragen
10.02.? (dann Major KW27 möglich)
|
| Spezifikationen aus Konglomerat Navigationsbaum beenden
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1324
|
| Natalie, Frank, Monika |
|
| 10.02.2026 |
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1389
|
| Karim, Peter, Monika
|
| Christian Rucho Thema | Bitte eintragen |
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1369
|
| Karim, Peter, Monika |
|
| Bitte eintragen |
|
|
Unterhalb Themen die definitiv kommen
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1443
|
| Carla federführend
|
| Initial Anforderung hier  Anforderung_IN2029
Investcontainer 2029 → Thema kommt am  → Wichtigstes Thema in PI39 → Umsetzung August 2026 / Spez.-Deadline oder
| ? |
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1361
Feature wird nicht in PI39 von AST gezogen
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1419
|
| Carla
Valeria
|
| Carla
Prio: Baufreiheiten → Hacon erarbeitet das Konzept, Team AST gibt Einschätzung dazu ab → Deadline Spez.  oder 
Analyse läuft über Johannes uns Sabine
TCSM16-MMMM - Carla liest durch, Tätigkeiten kommen ggf. erst ab Mitte PI39
------------------------------------------
Valeria
Strategie mit Lea
BKE Themen
| Spez Baufreiheiten bis 10.02.2026 |
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1338
Inhalte 
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1272
 TCSM16-1153   Verbesserung Eingabe Datum von / Datum bis und weitere Eingabemöglichkeiten bezüglich Datum/Gültigkeit
TCSM16-3934  Massenfunktion für IAV-Gleis Bearbeitung
TCSM16-4134   Pagination für Suchergebnisse vorsehen
|
|
|
| CRs, Regression und Defect-Nachtest | Go-live geplant für 01.02.2026 |
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1138
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1420das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1421
|
| Jens Florian
|
|
|
|
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1374
|
|
|
| CRs, Regression und Defect-Nachtest | go-live geplant für 13.03.2026 |
|
|
| Lieferung KW11
|
|
|
| für 13.03.2026 Übergabe an DB, dh Testdesigns in PI 39 schreiben | 13.03.2026 Übergabe an DB zum Test |
|
|
| Sammler Operative und ungeplante Tätigkeiten
|
| Team alle |
| Schulungswesen
FBF Unterstützung
....
|
| Folgeaufwände bei FOPS?
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1429
|
| Valeria, Carla
|
| Planung für PI39
PI39, 01.26 (BBPneo): Auswertung ungenutzter Objekte im System
PI39, 01.26 (BBPneo): Löschung ungenutzter Objekte (Klickroboter)
PI39, 01.26 (BBPneo, PzE): User-Befragung zur Schnittstelle → Anfang Januar starten lassen
PI39 (BBPneo): Projektnummern, DSGVO Check
PI39 (BBPneo, PzE): Vorbereitung nächste Datenübertragung (kompletter Ablauf, u.a. auch "neo meldet erfolgreiche Übertragung") → Sprint 7 im PI39
PI39 (BBPneo, PzE): Anforderungen aus Befragungen ableiten und bewerten → Auswertung & Clusterung Anfang Februar; Bewertung der Anforderungen
Abhängigkeiten zu PzE
gemeinsame Auswertung der User Umfrage
gemeinsame Planung des nächsten Imports
|
| PzE - Rücksprache über geplantes Vorgehen Meetings und Aufwände prüfen
Folgeaufwände bei FOPS?
|
|
|
|
|
|
|
|
| Folgeaufwände bei FOPS?
|
|
@@ -0,0 +1,37 @@
# PI 39 Team Objectives
Version: 9 | Last modified: 2025-12-11T14:24:45.687+01:00
Source: confluence page ID 525215762
---
Team | commited | uncommitted |
AST
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eAST-3710
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eAST-3711
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eAST-3736
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eAST-3713
|
BaBeDaS | das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eBABEDAS-3418
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eBABEDAS-3415
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eBABEDAS-3419
|
FOps | das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eFOPS-3849
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eFOPS-3852
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eFOPS-3987
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eFOPS-3853
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eFOPS-3963
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eFOPS-3990
|
|
InfraTEC |
|
|
PZE | [C2SBBP-1451] PzE: Betreuung der EA für MKM 2029/2030 - DB InfraGO ITD Lifecycle Management Tool
[C2SBBP-1354] PzE: Für die Nutzer werden Unterstützungen während der Eingabe bereitgestellt - DB InfraGO ITD Lifecycle Management Tool
[C2SBBP-1458] PzE: Schaffung einer Abnahmeumgebung um dieses Vorgehen aus der Entwicklungsumgebung herauszulösen - DB InfraGO ITD Lifecycle Management Tool
[C2SBBP-1457] PzE: Bearbeitung von Compliance-Themen (SBF, CSA, Rollenmodell, DeBi und RAIS-Katalog) - DB InfraGO ITD Lifecycle Management Tool
[C2SBBP-1462] PzE: Aufbau eines Anforderungsmanagements für das PzE - DB InfraGO ITD Lifecycle Management Tool
[C2SBBP-1290] PzE: Unterstützung bei der Eingabe/Auswahl der Technischen Plätze | PI 37 + PI 38 + PI 39 - DB InfraGO ITD Lifecycle Management Tool
|
|
@@ -0,0 +1,450 @@
# [PI 40] Team AST
Version: 44 | Last modified: 2026-03-18T14:30:53.828+01:00
Source: confluence page ID 517792343
---
Objectivesdas I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3940
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3938
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3937
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-3939
Risiken & Abhängigkeiten
12
bcdef471-cf65-4cce-9120-5a9ab1df71d3
incomplete
Risiko
13
a51e1758-25c4-435a-a5e5-3f280a34c7a7
incomplete
das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1492 
14
ecdcb048-9e2a-4f2b-ae96-84642663cba9
incomplete
Abhängigkeit
18
939d60e5-9ca4-4e91-87e1-1d508b132800
complete
Haben die Architekten etwas spezifiziert was wir als Teams verstehen oder vorbereiten und testen müssen?
19
ec5c3eed-258e-42ac-afaa-c35757679113
incomplete
Wir brauchen Infos wenn BKE live geht > Prozesstest muss verstanden und angepasst werden.
20
5492ac6c-8de0-45be-889b-0edc18b959ce
incomplete
Datenlieferungen für Invest-Container mikroskopisch und PzE
23
ea7f41b9-aa11-4dfa-9cea-3fa990338aea
complete
FOps Spez noch mal durchsprechen, was haben sie vor, welche Austauschbedürfnisse gibt es?
24
ceeb7ddc-9c8b-4892-87bb-7edbded2e7aa
incomplete
 Wissenstransfer SDT 120
Grobe Themengebiete für PI40 - Ziele nach aktueller PrioPrio in PI | Thema
| Feature
| wer?
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Abschluss Feature in PI 40  möglich?
| Abhängigkeiten
| Risiken
|
| (Analyse + Spez-Abschluss) Investcontainer 2029 - Überdeckungsprüfung
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1521
| Carla + Monika + Nataliia
|
| TCSM16-4472
Ziel KW39,  (major)
|
|
|
|
| (Analyse + Spez-Abschluss) Investcontainer 2029 - Anzeige im Baubetriebsplan
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1522
| Valeria + Karim + Frank
|
| TCSM16-4473 Anzeige von Containerobjekten steuern können
Ziel KW39, (major)
|
|
|
|
| (Analyse und bei go-Entscheidung, Spez ggf. bis Abschluss) 
Investcontainer 2029 - BBRn automatisiert erstellen
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1518
| Monika + Peter
|
| TCSM16-4489
Ziel KW 51,  (major)
Beginn erst nach 28.04.2026
Wunsch: es sollte mindestens bis PI Ende geklärt sein, ob hier spezifiziert wird, oder nicht.
|
|
|
|
| (Analyse, ggf. Beginn Spez) Import & Anzeige Baufreiheiten
| Feature 1 für Import und Anzeige
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1361
| Natalie
(Spez Lead)
Frank 
Monika fachlich
|
| Ziel KW 51, (major)  
Beginn erst nach 28.04.2026
Doku zum Thema hier: Baufreiheiten in BBPneo - C2S | BARD | ART - ariJa Confluence
Folgecases, die beachtet aber in diesem PI NICHT spezifiziert werden müssen
Folgecase PI41 ff
TCSM16-4465    Inkonsistenzen in Baufreiheiten ermitteln und beheben
TCSM16-4464    IT-Baustein zur Baufreiheiten-Prüfung
|
|
|
|
| (Analyse und Spez-Abschluss) Pagination im Baubetriebsplan
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1335
| Andreas + Peter, (Karim) Monika fachlich, einmal die Architekten abholen
|
| TCSM16-4135
Ziel KW39,  (major)
Analyse + Spez
Federführend: AST oder Architekten noch zu klären
|
|
|
|
| (go- Entscheidung + Spez Abschluss) 4280 Stationsfolge drehen und KM
|
| Monika, Karim, Peter
|
| Termin mit Sabine + Carla
Ziel KW39,  (major)
|
|
|
|
| PzE Vorbereitungen
|
| Valeria + Carla + PzE
|
| Was wird wann importiert?
Zeitleiste für Tests und PROD Importe + Kommunikation klären.
Tests
|
|
|
|
| Testautomatisierung
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1501
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1503
| Jens Florian
|
| Tickets für: 
Onboarding neue TAs
Testfälle
GIT Anbidung
|
| FOPS
|
|
| Lieferung KW11
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1375
| Team alle
|
|
|
|
|
|
| Lieferung KW15
|
| Team alle
|
|
|
|
|
|
| Lieferung KW19
|
| Team alle
|
|
|
|
|
|
| Beginn Vorbereitung RC KW27 der in KW23 kommt
|
| Frank,
Karim,
Nataliia,
Peter,
Monika,
Andreas
|
| Inhalte der Lieferung RC KW23,
Testdesigns schreiben für markierte, der Rest in anderen Teams!!!
 TCSM16-4327   Investcontainer 2029: mikroskopische Verortung importieren 
TCSM16-4326   Betra-Antrag - Überdeckung zwischen BBMN und Betra prüfen 
TCSM16-4417   Export verknüpfter Bedarfs-bVE und -BBMN (bis spät. KW27)
TCSM16-4471   Invest-Container Neue Attribute einführen
TCSM16-4470   Invest-Container: Erzeugen und Befüllung von Fachobjekten
TCSM16-4434   IH-Container - Massenfunktion zum Einfügen der Verortung aus der Suche 
TCSM16-4360   Anpassungen im Baum vornehmen (Symbole und Sortieren) 
TCSM16-4123   Anpassung und Sortierung der Differenzansicht bei Betra-Anträgen 
TCSM16-4486   Anpassungen im Baum vornehmen (Fixierung der Baumansicht) 
|
|
|
|
| Sammler operative Themen
|
| Team alle
|
|
|
|
|
|
Mögliche Themen
|
| Containerketten (IH)
|  noch nicht vorhanden
|
|
| Anforderung liegt vor, wurde aber noch nicht priorisiert für PI 40
Anforderer: Markus Thäter
Im Kopiervorgang werden die Iterationen erstellt 
Wunsch: in jeder Kette soll eine ID angebracht werden, damit besser ausgewertet werden kann.
Süd-26-INTEGER
|
|
|
|
| Erweiterung des int. Koordinationsblattes um neue Felder/Werte
| neu reingekommen als Anfrage bei Carla m 13.03.206
|
|
| ? Johannes Scharpf befragen
|
|
|
|
| Investcontainer 2029 - Folgecase Import
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1443kann auch bis PI41 ff warten
|
|
| TCSM16-448X
|
|
|
|
| 4339 BBR Spez
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1389
| Monika + XXX
|
| NEU VOM TRIO PRIORISIEREN LASSEN
|
|
|
|
| SE/IAV überarbeiten ggf. zusammen mit Anf aus Invest
| Vorgangsnavigator - DB InfraGO ITD Lifecycle Management Tool
+ SB2 Anforderungen
|
|
| Termin kommt erst noch, ggf. gar kein Thema für PI40
|
|
|
|
|
|
|
|
|
|
|
|
|
| Suchfilter ausmisten und konfigurierbar machen?
| Vorgangsnavigator - DB InfraGO ITD Lifecycle Management Tool
|
|
|
|
|
|
|
| eigene Berichte erstellen können
| mehrere Anwenderwünsche, aber bisher keine Prio
|
|
|
|
|
|
|
| Streckenkombinationen überarbeiten
| es liegen einige Tickets vor
Vorgangsnavigator - DB InfraGO ITD Lifecycle Management Tool
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
@@ -0,0 +1,507 @@
# [PI 41] Team AST
Version: 74 | Last modified: 2026-06-16T13:23:59.957+02:00
Source: confluence page ID 559597549
---
Grobe Themengebiete für PI41 - Ziele nach aktueller Prio
Schattenfinder korrigieren
TA vorantreiben
Objectivesdas I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-4070
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-4071
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-4221
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-4088
Risiken & Abhängigkeiten
3
incomplete
Risiko:
20
fb384221-cf79-4590-a433-8474f734561b
complete
Durch die Unklarheit & Komplexität der fachl. Anforderungen zur Umsetzung der Baufreiheiten, besteht das Risiko, dass die systemunterstützte baufreiheits-gerechte Baubetriebsplanung erst später spezifiziert werden kann.
Risiken-Syntax:
"Aufgrund von [Ursache] besteht das Risiko, dass [Risiko], was dazu führen könnte, dass [Effekt], wodurch [messbarer Impact] entsteht."
6
incomplete
Abhängigkeiten
13
ab8d05c2-79d2-4930-9658-f87b452371f8
incomplete
Haben die Architekten etwas spezifiziert was wir als Teams verstehen oder vorbereiten und testen müssen?
14
0fc088b0-2099-44ff-9af2-b9cc4727a046
incomplete
 FOPS
21
8598fd71-7475-4f5c-8c29-c804b3c927ec
incomplete
Konfig für Baumansicht definieren und übergeben
10
510e0853-73a6-4cca-b468-14d6a536ae65
incomplete
Konfig neue Invest-Cases (Überdeckung) > IT Bausteine & SDTs (kommt erst mit KW39)
22
1e55f255-1c4d-4207-9cdb-5227839afa82
incomplete
Rechte für Funktionen mit Fachbereich abstimmen + FOPs abholen
23
027acb61-70a8-43f9-bb24-509f0b68c579
incomplete
Container IH Massenfunktion, UAT durchführen > Natalia, Frank, Monika
24
22d59cfa-211b-4e45-809c-b77e032316ec
incomplete
Invest: Berechtigungen für Massenfunktion BBMN Erstellung > Carla
Prio | Feature
| Who?
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Abschluss Feature in PI   möglich?
| Abhängigkeiten
| Risiken
|
1 | Schattenfinder korrigieren FBFBBPNEO-14024
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1567
| Natalie, Karim
|
| Muss, weil aktuell prozessphasenübergreifend verknüpft werden kann und hierdurch Nachbearbeitungsaufwand entsteht, auch Invest-Container können im KKM tVE:bVE verknüpft werden, das ist so nicht vorgesehen.
Schattenfinder tVE.BVE muss so angepasst werden, dass bestimmte Kennungen oder Arten der Arbeiten ggf. (zu prüfen) auch prozessphasenscharf aus dem Angebotsfenster ausgeschlossen werden. 
Ziel: Analyse + Spez
|
|
|
|
2 | BBRn automatisiert erstellen können
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1518
| Monika, Steffen, Peter
|
| Vorstellung Silvio + Carla + PM 
go/no go Entscheidung treffen
Falls Spez bis 10.07. für KW51_2026 abschließen
offener Punkt: Einfärbung (Carla gerade inhaltlich unklar, wird noch im Team besprochen)
|
|
|
|
3 | KW23 Lieferung!
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1378
| Team alle
|
| Lieferdatum: 10.06.2026 
CRs antesten, keine Regression usw.
|
|
|
|
4 | KW27 Lieferung
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1565
| Team alle
|
| Lieferdatum: 03.07.2026
Regression + CRs + Defect
UAT für IH Massenfunktion durchführen
UAT für Navigationsbaum durchführen?
|
|
|
|
5 | Baufreiheiten in BBPneo umsetzendas I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1361
| Monika,
Frank,
Natalie
|
| UNCOMMITTED und nur Analyse!
keine fachliche Deadline, aktuell kein Prozessowner
erster Schritt: Import > Achtung: Datenlieferant + Datengrundlage (Mikro, makro) klären
Ampellogik gewünscht > wie mit Ausnahmen umgehen?
Feature enthält weitere Fragestellungen
|
|
|
|
| KEINE Lieferung KW31
|
|
|
|
|
|
|
| Lieferung KW35
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1566
| Team alle |
| Lieferdatum: 28.08.2026 
 Regression + CRs + Defect
|
|
|
|
| das I.NVI IT Lifecycle Management Toold1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1636
| Peter,
Andreas
|
| Testdurchlauf nach 3. Korrektur - TCSM16-1139 CR 533: Import der Stammdatentabelle 120 via Interface
|
|
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1563
| TA BBPneo
TEAM ALLE
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eAST-4088
| Neue Tests erstellen
Zeit blocken für Aufbereitung Testfälle und Abnahmen!
|
|
|
|
| Sammler PI41 (noch kein Feature vorhanden)
|
|
|
|
|
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1574
| Monika
Peter, Monika
|
| FBF Unterstützung
Schulungsunterlagen Technische Anmelder
...
Hierin abzulegen ist:
organisatorische Aufgaben
Abstimmungen und Schulungen
PI-/ART-Vorbereitung
laufende Support-Themen ohne strukturelle Änderung
Nicht mehr im Sammler-Feature ablegen:
Verbesserungen oder Weiterentwicklungen
technische Lösungen oder Skripte
Test- und Qualitätsmaßnahmen
Berechtigungs- oder Prozessthemen
|
|
|
|
| Quickwins spezifizieren
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1646 |
Steffen, Karim
|
| Frist: Spez-Ende KW39, wenn das nicht gehalten werden kann im Zweifelsfall abmoderieren
Änderungen in Verortung besser darstellbar gestalten (Variante textuelle Verortung farblich hervorheben; Ausbaustufe Kartendarstellung (vermutlich teuer)
TCSM16-4604 Weitere Attribute aus tVE übernehmen: "Attribute aus technischer VE übernehmen" -> Liste prüfen hinsichtlich weiterer Attribute neben "Beschreibung der Arbeiten" 
Bearbeitungskennzeichen für Anmeldung und BBMN: Gespräch mit Usern aus User Workshop notwendig, weil Sabine und ich unsicher sind, ob das Bearbeitungskennzeichen wirklich den Pain löst.
Fristen in Anmeldung besser darstellen: Gespräch mit Usern aus User Workshop notwendig, weil unklar, welche zusätzlichen Infos warum und wo gewünscht sind.
|
|
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1598
|
|
| To Dos fürs nächste PI festlegen
Tickets entsprechend anlegen
|
|
|
|
| Spez 4544
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1369
| Monika, Karim, Peter
|
| Übertrag aus verherigem PI - Klären ob abgebrochen wird oder nicht (Monika + Carla)
Falls Go: Fertig spezifizieren bis nächstmöglichem Release
Stand 03.06: Karim findet raus, ob Hacon die gewünschten ISS Daten bekommen hat. Wenn ja, dann Carla bitten Hacon anzuschreiben.
Ergebnis HaCon Spez-Call 09.06.2026: 
Datenproblem -  Dienslaken liegt angeblich auf der falschen VzG. 
Mögliche Lösungen: 
Datenlage beheben (Klärung mit ISS)
Algo Anpassen  
Korrektur-Funktion in den TCSM16-4544 mit einbauen lassen.
|
|
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1600
| Andreas, Steffen
|
| Testimport Invest 2029
Prod Import Invest 2029
Nachpflege Containertyp (FOps)
|
|
|
|
| noch nicht priorisiert, klären im Team ob überhaupt Capa besteht
|
|
| Nachbearbeitung BBMN Erstellung Invest: Wenn Anmeldung Containertyp X hat, erhält BBMN gleichen Containertyp & gleiche Logik für BKE ID aus 1.KP
Einzelfunktion und Massenfunktion (KW27) betrachten!
|
|
|
|
| das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1389
| Karim,
Peter,
Monika (nur Übergabe)
|
| ist bislang liegengeblieben
war eine SB2 Anforderung über Christian Rucho, wurde von Lea + Monika besprochen
welche Prio hat dieses Thema ggü den anderen Themen, die noch zu machen sind?
|
|
|
|
Sonstige Themen, falls etwas abgesagt wird oder perspektivisch noch gemacht werden müssen
|
| noch nicht priorisiert, klären im Team ob überhaupt Capa besteht
das I.NVI IT Lifecycle Management Toolissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolutionkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolutiond1143f0d-33c0-3f1c-b44b-7720150f306eC2SBBP-1619
|
|
| Analyse: SE/ IA Informationen sollen ausschließlich bei Invest-Objekten zwischen Bedarf und Hülle synchronisiert werden.
Inhaltlich liegt die Anforderung gerade noch zur Klärung bei Valeria.
Anforderung kommt aus Invest-Gruppe, nicht von einem konkreten Fachbereich. Ansprechpartner wären wieder Silvio, fachlich wär es ratsam, auch Kai Plankermann (SE/IA) und Benjamin + Eileen abzuholen.
|
|
|
|
| (Container) Wenn Anmeldung Containertyp X hat, erhält BBMN gleichen Containertyp & gleiche Logik für BKE ID
|
|
|
|
|
|
|
| Überarbeitung Import Invest-Objekte
|
|
| neue Felder wie BKE.ID aus KP1, Containertyp (jetzt an Anmeldungen) usw. sollen künftig per Import befüllt werden, Aktuell sind die Felder da, können aber vom Import noch nicht angesprochen werden.
es ist unklar, ob es weitere Anforderungen an den Investimport geben wird, sonst wird der Import-Case hier zweimal aufgemacht.
Lea oder Sabine pingen die SB2 Kollegen zur Klärung an
|
|
|
|
| keine eigene BBR für SE/IA mehr erstellen? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| FBFBBPNEO-12286
Analyse + Konfig: Anmeldung in Status "Anmeldung bearbeitet" aber ohne Verknüpfung zu BBMN
|
|
|
|
|
|
|
| FBFBBPNEO-13615
Darstellung der Uhr in BBR - Zugpausen - mal da, mal nicht da
|
|
|
|
|
|
|
| Analyse Streckenkombinationen überarbeiten
|
|
|
|
|
|
|
| FBFBBPNEO-13362
Rundung von Sperrzeiten in Zusammenfassung
|
|
| Könnte schnell analysiert werden und auf Dezimalzahlen gefixt werden
Rücksprache mit Reporting bzw. Folgesystemen notwendig
Option zum Ausschalten vorsehen
|
|
|
|
| Container-Ketten (Anf Markus Thäter) Ausbaustufe 1
|
|
| diverse Themen aus Mail (konnte ich leider hier nicht ablegen) 
WSJF: sehr niedrig geranked > vrmtl. Entscheidung nächste Woche / aktuell können die Attribute auch ggf per Export "zusammengesucht" werden.
|
|
|
|
| SE/IA überarbeiten
| Monika
|
| diverse Themen aus Mail (konnte ich leider hier nicht ablegen) 
Sortierung SE/IA mit aufnehmen
Produktive Änderung von SE/IA und Probleme betrachten
|
|
|
|
|
|
|
| Richtiges Verknüpfen von Enabler Stories:
Für Technische/inhaltliche Themen → eigene Enabler-Features nutzen
Nicht mehr ins Sammler-Feature:
Regel: → Klare Ziel-Story + thematisch passend → in Feature, nicht Sammler
C2SBBP-1575 Automatisierung & Tooling PI41
C2SBBP-1574 Sammler "Operatives & Run" PI41
C2SBBP-1578 Prozess- & Dokumentationsstandardisierung PI41
C2SBBP-1576 Identity & Access Management PI41
C2SBBP-1577 Qualitätssicherung & Testprozesse PI41
|
|
|
|
@@ -0,0 +1,228 @@
# [PI - 42] Team AST (ÜBERGABETHEMEN BITTE LESEN!)
Version: 4 | Last modified: 2026-06-08T16:07:05.836+02:00
Source: confluence page ID 593806827
---
Grobe Themengebiete für PI42 - Ziele nach aktueller Prio
Objectives
Risiken & Abhängigkeiten
3
incomplete
Risiko:
20
fb384221-cf79-4590-a433-8474f734561b
incomplete
 
Risiken-Syntax:
"Aufgrund von [Ursache] besteht das Risiko, dass [Risiko], was dazu führen könnte, dass [Effekt], wodurch [messbarer Impact] entsteht."
6
incomplete
Abhängigkeiten
13
ab8d05c2-79d2-4930-9658-f87b452371f8
incomplete
Haben die Architekten etwas spezifiziert was wir als Teams verstehen oder vorbereiten und testen müssen?
14
0fc088b0-2099-44ff-9af2-b9cc4727a046
incomplete
 FOPS
21
8598fd71-7475-4f5c-8c29-c804b3c927ec
incomplete
Konfig für XY definieren und übergeben
10
510e0853-73a6-4cca-b468-14d6a536ae65
incomplete
 
22
1e55f255-1c4d-4207-9cdb-5227839afa82
incomplete
Fachbereich
29
ded2eee6-6e93-4237-be9d-bf1a37c22930
incomplete
Gibt es etwas abzustimmen?
Prio | Feature
| Who?
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Abschluss Feature in PI   möglich?
| Abhängigkeiten
| Risiken
|
| (Container) Wenn Anmeldung Containertyp X hat, erhält BBMN gleichen Containertyp & gleiche Logik für BKE ID |
|
| Übergabe Carla, muss noch umgesetzt werden bis Invest 2030 importiert wird, Spez Deadline ist meistens Anfang des Jahres für MAJOR KW27 |
|
|
|
| Überarbeitung Import Invest-Objekte
|
|
| Übergabe Carla, muss noch umgesetzt werden bis Invest 2030 importiert wird, Spez Deadline ist meistens Anfang des Jahres für MAJOR KW27
neue Felder wie BKE.ID aus KP1, Containertyp (jetzt an Anmeldungen) usw. sollen künftig per Import befüllt werden, Aktuell sind die Felder da, können aber vom Import noch nicht angesprochen werden.
es ist unklar, ob es weitere Anforderungen an den Investimport geben wird, sonst wird der Import-Case hier zweimal aufgemacht.
Lea oder Sabine pingen die SB2 Kollegen zur Klärung an
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sonstige Themen, falls etwas abgesagt wird oder perspektivisch noch gemacht werden müssen
|
| FBFBBPNEO-12286
Analyse + Konfig: Anmeldung in Status "Anmeldung bearbeitet" aber ohne Verknüpfung zu BBMN
|
|
|
|
|
|
|
| FBFBBPNEO-13615
Darstellung der Uhr in BBR - Zugpausen - mal da, mal nicht da
|
|
|
|
|
|
|
| Analyse Streckenkombinationen überarbeiten
|
|
|
|
|
|
|
| FBFBBPNEO-13362
Rundung von Sperrzeiten in Zusammenfassung
|
|
| Könnte schnell analysiert werden und auf Dezimalzahlen gefixt werden
Rücksprache mit Reporting bzw. Folgesystemen notwendig
Option zum Ausschalten vorsehen
|
|
|
|
| Bisher nicht neu anmoderiert TRIO
Container-Ketten (Anf Markus Thäter) Ausbaustufe 1
|
|
| diverse Themen aus Mail (konnte ich leider hier nicht ablegen) 
WSJF: sehr niedrig geranked > vrmtl. Entscheidung nächste Woche / aktuell können die Attribute auch ggf per Export "zusammengesucht" werden.
|
|
|
|
| SE/IA überarbeiten
| Monika
|
| diverse Themen aus Mail (konnte ich leider hier nicht ablegen) 
Sortierung SE/IA mit aufnehmen
Produktive Änderung von SE/IA und Probleme betrachten
|
|
|
|
|
|
|
|
|
|
|
|
@@ -0,0 +1,219 @@
# [PI -] Team AST (Vorlage)
Version: 5 | Last modified: 2025-09-16T13:52:44.664+02:00
Source: confluence page ID 386400100
---
Grobe Themengebiete für PI35 - Ziele nach aktueller Prio
ObjectivesObjective 1: text
Objective 2: text
Objective 3: text
Objective 4: text
Objective 5: text
Risiken & Abhängigkeiten
3
incomplete
Risiko
6
incomplete
Abhängigkeit
| Prio in PI
| Feature
| Commit?
| vorhandenes Objective / Idee Objective
| Inhalt/offene Tätigkeiten
| Abschluss Feature in PI 35  möglich?
| Abhängigkeiten
| Risiken
|
1 |
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
|
|
|
3 |
|
|
|
|
|
|
|
|
4 |
|
|
|
|
|
|
|
|
5 |
|
|
|
|
|
|
|
|
6 |
|
|
|  
|
|
|
|
|
7 |
|
|
|
|
|
|
|
|
8 |
|
|
|  
|
|
|
|
|
9 |
|
|
|  
|
|
|
|
|
10 |
|
|
|
|
|
|
|
|
 11 |
|
|
|
|
|
|
|
|
12 |
|
|
|
|
|
|
|
|
13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
@@ -0,0 +1,12 @@
# PM Team
Version: 5 | Last modified: 2026-04-13T11:27:02.613+02:00
Source: confluence page ID 307736432
---
Produktmanagerin | Produktmanagerin | PM-Support |
|
|
|
@@ -0,0 +1,11 @@
# RTE Team
Version: 7 | Last modified: 2026-04-30T11:11:44.230+02:00
Source: confluence page ID 307736338
---
RTE | Co-RTE |
|
|
@@ -0,0 +1,38 @@
# Service-Verantwortung im Team
Version: 79 | Last modified: 2026-04-08T10:41:07.466+02:00
Source: confluence page ID 330999926
---
Unsere rollierende Service-VerantwortungWochenweise behalten jeweils zwei Personen unsere Bereitschaft
Die Personen, welche die Prod. Support-Woche übernehmen, fragen die ab 
Wissensträger dazu sind: Ilija, Owen, Halim
Sollten sich Auffälligkeiten ergeben, melden sie dies dem Team und wir überlegen uns weitere Schritte.
fachliche Verantwortlichkeit und Aufgaben 
Doku-Zeit / Service-Zeit reservieren in einem Sprint
Immer 2 BA/BE pro Sprint (1 Bearbeiter, 1 Participant). "Hierarchie": Bearbeiter ist 1. Ansprechpartner, nur wenn dieser ausfällt, dann Participant. VERANTWORTUNG nur fürs Postfach.
Bei jedem Kunden: Kurze Übersicht, was bereits passiert ist: Abnehmende Systeme
Bei jedem neuen Kunden: Seite anlegen oder dort dokumentieren Abnehmende Systeme + Hinweis auf Data Contract
Die verantwortliche BA/BE-Rolle darf bei anstehenden Terminen mit dem Kunden, vorab die anderen im Team zu Infos fragen
Wenn Anfragen an BaBeDaS.fach oder Melanie gehen, dann erstellt der / die Verantwortliche einen Termin mit dem Kunden
Die Service-Verantwortlichen schauen regelmäßig in das Postfach BaBeDaS.fach
Hinweis: Unsere Team-Reaktions-Zeit (nicht Lösungszeit) ist 24h, d. h.: Bitte Mails in der Zeit beantworten. Sollten wir in der Zeit die Anfrage nicht erledigen können, gibt es im Ordner "Archive" eine Standard-Antwort (VORLAGE... ).
Auftreten nach Außen: 
Wir beantworten Fragen unserer Kunden über:
Mailpostfach BaBeDaS.fach@deutschebahn.com
MS Teams Kanal BaBeDaS Kundenservice
Wir verwenden eine einheitliche Signatur. Diese steht im Postfach, im Ordner "Archive" zur Verfügung (VORLAGE... ).
Technische Verantwortlichkeit und Aufgaben
vgl.
Postfach BaBeDaS.op checken, Grafana Alerts nachgehen
Prüfen ob alle Service am BizHub erreichbar sind
Prüfen ob der Dispatcher gestern gelaufen ist / läuft wenn er laufen soll / Datenaktualität sicherstellen
Prüfen ob die Pods laufen, ggf. auf die Logs schauen
Störungen erfassen
Unser Service-Level-Agreementtrue
@@ -0,0 +1,29 @@
# Team FOps
Version: 2 | Last modified: 2026-06-11T13:13:26.583+02:00
Source: confluence page ID 602314587
---
Name | FOps 
|
|
Warum gibt es uns?  |
INLINEWir verantworten die fachliche Betriebsführung von BBPneo und betreuen als direkter Ansprechpartner alle Anwender:innen sowie den Fachbereich. 
|
Kontakt | Product Owner (PO):
Scrum Master (SM) / Team Coach:
|
Unsere Jira-Projekte:  | https://arija.jaas.service.deutschebahn.com/projects/FOPS/summary
https://arija.jaas.service.deutschebahn.com/projects/FBFBBPNEO/queues |
Für ART-interne Anfragen/Anliegen:  | C2S.BARD.FOps@deutschebahn.com
|
Für BBPneo User Anfragen / Anliegen:  | https://arija.jaas.service.deutschebahn.com/servicedesk/customer/portal/7
|
|
@@ -0,0 +1,103 @@
# Team Themen für die Breakout Sessions MidPI 39
Version: 26 | Last modified: 2026-02-03T13:45:05.194+01:00
Source: confluence page ID 487746294
---
Raum und Zeit für die Teams, um an Team internen Themen zu arbeiten
Team AST
|
Thema
| Kurze Zusammenfassung  | Wunsch Trio-TN
| Facilitator (SM)
| Teilnehmer
| Raum 
|
Meeting Qualität verbessern  | Wir challengen unser Verständnis als Team. 
Ziel: Ein konkretes Thema besprechen, wo wir als Team kein gemeinsames Verständnis haben. 
| Nope
|   | Team AST
|
|
Team InfraTEC - endgültiges Thema noch in Abstimmung
|
Thema
| Kurze Zusammenfassung  | Wunsch Trio-TN
| Facilitator (SM)
| Teilnehmer
| Raum 
|
Knowledge Transfer Couchbase | Couchbase ist nun seit knapp einem Jahr im Einsatz. Die initiale Umsetzung des Tools hatte Matthias gemacht, so dass hier eine Wissensinsel entstanden ist.
Da Couchbase essentiell für einen stabilen und performanten Betrieb von BBPneo ist, ist es wichtig, dass alle Teammitglieder wissen, wie sie mit Couchbase umzugehen haben und wie sie im Fehlerfall reagieren können.
|
|   | Team InfraTec
|
|
Team FOps
|
Thema
| Kurze Zusammenfassung  | Wunsch Trio-TN
| Facilitator (SM)
| Teilnehmer
| Raum 
|
Themen aus dem FOps-Retro-Board besprechen | Testdrehbuch reviewen: Wer ist wofür beim Test verantwortlich?
Themen aus Retro Wall Besprechen
Sprint 4: 21.01. - 02.02. - RetroWall - C2S | BARD | ART - ariJa Confluence
|
|   | Team FOps
|
|
Team BaBeDaS
|
Thema
| Kurze Zusammenfassung  | Wunsch Trio-TN
| Facilitator (SM)
| Teilnehmer
| Raum 
|
Ablösung Clonprozess | Clonprozess ersetzen durch Workflowdelta im ersten Schritt, Komplettdelta im nächsten (über DMS-SW). In diesem Zusammenhang auch Prozessumstellung (zb. Meetingumgestaltung)
Zusatzthema: Indizes für Oracle optimieren, intern oder extern
| Nein
|   | Team BaBeDaS
|
|
Team PzE
|
Thema
| Kurze Zusammenfassung  | Wunsch Trio-TN
| Facilitator (SM)
| Teilnehmer
| Raum 
|
Teambuilding + Anforderungsmanagement | In den letzten Wochen stand Teambuilding im Fokus, um die durch die Verdopplung der Teamgröße notwendige Neustrukturierung der Zusammenarbeit sowie die Definition von Rollen und Verantwortlichkeiten zu unterstützen.
Zudem arbeiten wir im Anforderungsmanagement an der Erhebung des IST-Zustands und der Strukturierung von Bedürfnissen, Problemen und Erkenntnissen – zunächst haben wir diese Erhebung bei PzE durchgeführt. Aktuell sind wir im Austausch mit BBPneo dran, ihre Probleme und Bedürfnisse zu verstehen.
| Nein
|   | Team PzE
|
|
Team TRIO (optional macht das TRIO eine Breakout Session, wenn TRIO nicht in den Teams BO Sessions gebraucht wird
|
Thema
| Kurze Zusammenfassung  | Wunsch Trio-TN
| Facilitator (SM)
| Teilnehmer
| Raum 
|
|
|
|
|
|
|